New York state on Friday said it wasn’t moving forward on three offshore wind farm projects after General Electric Vernova changed the turbine design to incorporate much smaller machines than the 18-megawatt turbines the original plans used, Reuters reports.
Advertisement
The state had provisionally approved the projects in October 2023, but officials said the reduced turbine size “materially altered” the original designs.
Join the conversation as a VIP Member