“Even in a country used to paying absurd prices for everything from houses to a pint of beer, it was still a pretty eye-watering figure. After initially being projected to cost under £40 billion in 2012, Britain’s second high-speed rail project, HS2, was recently calculated to be facing a price tag closer to £100 billion.”
“Just the first phase alone the 34 miles connecting London and Birmingham is in danger of becoming one of the most expensive railways ever built.”
It was originally supposed to pay for itself by offering high speed connections between London and three English industrial cities in the north: Manchester, Leeds and Sheffield. But ballooning costs forced the cancellation of those two line extensions.
(via Instapundit)
[I’m struck by the parallels between this boondoggle and the high-speed rail project in California. They even have nearly identical cost profiles, shifting projections, path redesigns, and especially astronomically accelerated cost growth. — Ed]
Join the conversation as a VIP Member